Public notices

PUBLISH

(March 7, 14, 2017)

Notice of Public

Hearing

Notice Is Hereby

Given, that the City

Council of the City of

New Ulm, Brown

County, Minnesota will

meet in the Council

Chambers in the New

Ulm City Hall on Tues-

day, March 21, 2017 at

4:30 p.m. to consider

ordering in the follow-

ing improvements, ex-

cept items 8, 9, 10 and

12 which have previ-

ously been approved to

be made, to-wit:

2017 Utility, Street and

Alley Improvements –

Group I

1. German Street from

12th North Street to

railroad R-O-W at 15th

North Street – Recon-

struction of the existing

water main, sanitary

sewer main, sewer and

water end services,

and reconstruction of

the existing roadway

section including exca-

vation and replace-

ment of subgrade, ag-

gregate base, bitumi-

nous paving, concrete

curb and gutter, con-

crete driveway pave-

ment, concrete side-

walk infill, pedestrian

sidewalk ramps, street

lighting and selective

replacement of con-

crete sidewalk.

2. Washington Street

from 6th North Street

to 10th North Street –

Reconstruction of the

existing water main,

sanitary sewer main,

sewer and water end

services, and recon-

struction of the existing

roadway section in-

cluding excavation and

replacement of

subgrade, aggregate

base, bituminous pav-

ing, concrete curb and

gutter, concrete drive-

way pavement, pedes-

trian sidewalk ramps,

street lighting and

selective replacement

of concrete sidewalk.

3. Oakwood Avenue

from Hollywood Ave-

nue to Boettger Road –

Reconstruction of the

existing roadway sec-

tion including excava-

tion and replacement

of subgrade, pavement

edge drains, aggregate

base, bituminous pav-

ing, storm sewer exten-

sion and selective re-

placement of concrete

curb and gutter and

concrete driveway

pavement.

4. Dacotah Drive,

Settler Trail and Benz

Circle in Dacotah West

Addition – Grading, ag-

gregate base, bitumi-

nous base, concrete

curb and gutter, con-

crete sidewalk, con-

crete driveway pave-

ment, bituminous sur-

facing, boulevard trees,

boulevard restoration

and street lighting.

5. Storm Water Hold-

ing Pond at 5th North

and Garden Street –

Muck excavation clean

out maintenance to es-

tablish original grades.

6. Alley Block 28 North

of Center Street –

Reconstruction of the

existing alley pave-

ment section including

grading, aggregate

base, bituminous sur-

facing, seven inch (7″)

concrete alley ap-

proach pavement, mis-

cellaneous removals

and restoration.

7. Alley Block 175

South of Center Street

– Reconstruction of the

existing alley pave-

ment section including

grading, aggregate

base, bituminous sur-

facing, seven inch (7″)

concrete alley ap-

proach pavement, mis-

cellaneous removals

and restoration.

8. Alley Block 115

North of Center Street

– Grading, aggregate

base, bituminous sur-

facing, seven inch (7″)

concrete alley ap-

proach pavement,

storm sewer, miscel-

laneous removals and

restoration necessary

to construct a residen-

tial alley pavement

section (improvement

petitioned).

9. Alley Block 119

South of Center Street

– Grading, aggregate

base, bituminous sur-

facing, seven inch (7″)

concrete alley ap-

proach pavement, mis-

cellaneous removals

and restoration neces-

sary to construct a

residential alley pave-

ment section (improve-

ment petitioned).

10. Alley Block 154

South of Center Street

– Grading, aggregate

base, bituminous sur-

facing, seven inch (7″)

concrete alley ap-

proach pavement, mis-

cellaneous removals

and restoration neces-

sary to construct a

residential alley pave-

ment section (improve-

ment petitioned).

11. Garden Street

from Center Street to

8th South Street and

8th South Street from

Garden Street to

Payne Street – Bitumi-

nous seal coat and

roadway striping.

12. 17th South Street

from Washington

Street to State Street –

Grading, aggregate

base, concrete curb

and gutter, bituminous

surfacing, concrete

sidewalk, concrete

driveway pavement

and boulevard restora-

tion (improvement peti-

tioned).

13. Retaining wall

reconstruction adjacent

to 1401 South Payne

Street – Reconstruc-

tion of the upper por-

tion of the existing

stone retaining wall.

14. Retaining wall

reconstruction adjacent

to the Theater building

on North German

Street – Stabilization

and reconstruction of

the failing concrete

block wall at the south

end of the Downtown

Mall German Street re-

taining wall.

pursuant to Minnesota

Statutes, Sections

429.011 to 429.111.

The area proposed to

be assessed for such

improvements is each

lot, piece and parcel of

property specially

benefited by said im-

provements. A reason-

able estimate of the

impact of the assess-

ment will be available

at the hearing. The to-

tal estimated cost of

the 2017 Utility, Street

and Alley Improve-

ments – Group I pro-

ject is $3,653,353.00.

Such persons as

desired to be heard

with reference to the

proposed improve-

ments will be heard at

this meeting.

BY ORDER OF THE

CITY COUNCIL

Nicole L. Jorgensen

Finance Director

Dated at New Ulm,

Minnesota

This 7th day of Febru-

ary 2017.

www.ci.new-ulm.mn.us

Newsletter

Today's breaking news and more in your inbox

I'm interested in (please check all that apply)
Are you a paying subscriber to the newspaper?
   

Starting at $4.38/week.

Subscribe Today