PUBLIC NOTICE

PUBLISH

(January 9, 16, 23, 30,

2024)

NOTICE TO

CLAIMANTS AND

CREDITORS

OF Cambria

Properties, Inc.

Cambria Properties,

Inc., a Minnesota cor-

poration, pursuant to

Minnesota Statutes

Section 302A.727,

hereby gives this no-

tice that it will dissolve:

1.Cambria Properties,

Inc., a Minnesota cor-

poration, is in the pro-

cess of dissolving.

2. Cambria Properties,

Inc. filed notice of its

intent to dissolve with

the Minnesota Secre-

tary of State on De-

cember 31, 2023.

3. Any written claims

against this corporation

must be presented to

the following office:

Cambria Properties,

Inc., 2232 South

Broadway, New Ulm,

Minnesota 56073.

That claim must be in

writing and include the

following information:

(a) Claimant’s name

and address; (b) A

summary of the basis

for the claim; and (c)

Total amount claimant

is alleging Cambria

Properties, Inc. owes

claimant.

4.The deadline for re-

ceipt of the claim is

April 9, 2024, which is

ninety (90) days after

the date this written no-

tice is first published.

Your claim will be

barred if not received

within ninety (90) days

after the date this writ-

ten notice is first pub-

lished.

PUBLISH

(January 23, 30, 2024)

Notice of Public

Hearin

Notice Is Hereby

Given, that the City

Council of the City of

New Ulm, Brown

County, Minnesota will

meet in the Council

Chambers in the New

Ulm City Hall on Tues-

day, February 6, 2024

at 4:30 p.m. to consid-

er ordering in the fol-

lowing improvements:

2024 Utility, Street and

Alley Improvements –

Group I

1. German Street from

Center Street to 3rd

North Street. Recon-

struction of the existing

watermain, sanitary

sewer main, sewer and

water end services,

storm sewer modifica-

tions, and reconstruc-

tion of the existing

roadway section in-

cluding excavation and

replacement of

subgrade, aggregate

base, bituminous pav-

ing, pavement sub-

drains, concrete curb

and gutter, pedestrian

sidewalk ramps, street

lighting and selective

replacement of con-

crete driveway pave-

ment and sidewalk.

2. Valley Street from

Center Street to 3rd

North Street. Bitumi-

nous Full Depth Recla-

mation (FDR) of the

existing roadway driv-

ing surface, bituminous

paving, selective re-

placement of concrete

curb & gutter, sidewalk

and pedestrian side-

walk ramps.

3. 12th South Street

from Minnesota Street

to Valley Street.

Reconstruction of the

existing roadway sec-

tion including excava-

tion and replacement

of subgrade, aggregate

base, bituminous pav-

ing, pavement sub-

drains, pedestrian side-

walk ramps and selec-

tive replacement of

concrete curb & gutter,

driveway pavement

and sidewalk.

4. North Broadway

from 19th North Street

to 20th North Street.

Bituminous Full Depth

Reclamation (FDR) of

the existing roadway

driving surface, bitumi-

nous paving, selective

replacement of con-

crete curb & gutter,

sidewalk and pedestri-

an sidewalk ramps.

5. Alley Block 77 North

of Center Street. Alley

from 11th North Street

to 12thNorth Street

between Broadway

and Minnesota Street.

Reconstruction of the

existing alley pave-

ment section including

grading, aggregate

base, bituminous sur-

facing, selective seven

inch (7″) concrete alley

approach pavement,

miscellaneous remo-

vals and restoration.

6. Alley Block 94 North

of Center Street. Alley

from 11th North Street

to 12thNorth Street

between Broadway

and State Street.

Reconstruction of the

existing alley pave-

ment section including

grading, aggregate

base, bituminous sur-

facing, selective seven

inch (7″) concrete alley

approach pavement,

miscellaneous remo-

vals and restoration.

7. Alley Block 103

North of Center Street.

Alley from 2nd North

Street to 3rd North

Street between Broad-

way and State Street.

Reconstruction of the

existing alley pave-

ment section including

grading, aggregate

base, bituminous sur-

facing, selective seven

inch (7″) concrete alley

approach pavement,

miscellaneous remo-

vals and restoration.

8. Miscellaneous Con-

crete Sidewalk and

ADA Improvements.

ADA pedestrian ramp

and recreational trail

improvements to com-

pliment the improve-

ments scheduled

within the 2024 Capital

Improvement Plan and

other deficient concrete

sidewalk at locations

determined by the City

Engineer.

pursuant to Minnesota

Statutes, Sections

429.011 to 429.111.

The area proposed to

be assessed for such

improvements is each

lot, piece and parcel of

property specially

benefited by said im-

provements. A reason-

able estimate of the

impact of the assess-

ment will be available

at the hearing. The to-

tal estimated cost of

the 2024 Utility, Street

and Alley Improve-

ments – Group I project

is $3,035,260.00. Such

persons as desired to

be heard with refer-

ence to the proposed

improvements will be

heard at this meeting.

By Order Of The City

Council

Nicole L. Jorgensen

Finance Director

Dated at New Ulm,

Minnesota

This 2 nd day of Janu-

ary 2024.

www.ci.new-ulm.mn.us

Newsletter

Today's breaking news and more in your inbox

I'm interested in (please check all that apply)
Are you a paying subscriber to the newspaper?
   

Starting at $4.38/week.

Subscribe Today