PUBLIC NOTICE
PUBLISH
(January 9, 16, 23, 30,
2024)
NOTICE TO
CLAIMANTS AND
CREDITORS
OF Cambria
Properties, Inc.
Cambria Properties,
Inc., a Minnesota cor-
poration, pursuant to
Minnesota Statutes
Section 302A.727,
hereby gives this no-
tice that it will dissolve:
1.Cambria Properties,
Inc., a Minnesota cor-
poration, is in the pro-
cess of dissolving.
2. Cambria Properties,
Inc. filed notice of its
intent to dissolve with
the Minnesota Secre-
tary of State on De-
cember 31, 2023.
3. Any written claims
against this corporation
must be presented to
the following office:
Cambria Properties,
Inc., 2232 South
Broadway, New Ulm,
Minnesota 56073.
That claim must be in
writing and include the
following information:
(a) Claimant’s name
and address; (b) A
summary of the basis
for the claim; and (c)
Total amount claimant
is alleging Cambria
Properties, Inc. owes
claimant.
4.The deadline for re-
ceipt of the claim is
April 9, 2024, which is
ninety (90) days after
the date this written no-
tice is first published.
Your claim will be
barred if not received
within ninety (90) days
after the date this writ-
ten notice is first pub-
lished.
PUBLISH
(January 23, 30, 2024)
Notice of Public
Hearin
Notice Is Hereby
Given, that the City
Council of the City of
New Ulm, Brown
County, Minnesota will
meet in the Council
Chambers in the New
Ulm City Hall on Tues-
day, February 6, 2024
at 4:30 p.m. to consid-
er ordering in the fol-
lowing improvements:
2024 Utility, Street and
Alley Improvements –
Group I
1. German Street from
Center Street to 3rd
North Street. Recon-
struction of the existing
watermain, sanitary
sewer main, sewer and
water end services,
storm sewer modifica-
tions, and reconstruc-
tion of the existing
roadway section in-
cluding excavation and
replacement of
subgrade, aggregate
base, bituminous pav-
ing, pavement sub-
drains, concrete curb
and gutter, pedestrian
sidewalk ramps, street
lighting and selective
replacement of con-
crete driveway pave-
ment and sidewalk.
2. Valley Street from
Center Street to 3rd
North Street. Bitumi-
nous Full Depth Recla-
mation (FDR) of the
existing roadway driv-
ing surface, bituminous
paving, selective re-
placement of concrete
curb & gutter, sidewalk
and pedestrian side-
walk ramps.
3. 12th South Street
from Minnesota Street
to Valley Street.
Reconstruction of the
existing roadway sec-
tion including excava-
tion and replacement
of subgrade, aggregate
base, bituminous pav-
ing, pavement sub-
drains, pedestrian side-
walk ramps and selec-
tive replacement of
concrete curb & gutter,
driveway pavement
and sidewalk.
4. North Broadway
from 19th North Street
to 20th North Street.
Bituminous Full Depth
Reclamation (FDR) of
the existing roadway
driving surface, bitumi-
nous paving, selective
replacement of con-
crete curb & gutter,
sidewalk and pedestri-
an sidewalk ramps.
5. Alley Block 77 North
of Center Street. Alley
from 11th North Street
to 12thNorth Street
between Broadway
and Minnesota Street.
Reconstruction of the
existing alley pave-
ment section including
grading, aggregate
base, bituminous sur-
facing, selective seven
inch (7″) concrete alley
approach pavement,
miscellaneous remo-
vals and restoration.
6. Alley Block 94 North
of Center Street. Alley
from 11th North Street
to 12thNorth Street
between Broadway
and State Street.
Reconstruction of the
existing alley pave-
ment section including
grading, aggregate
base, bituminous sur-
facing, selective seven
inch (7″) concrete alley
approach pavement,
miscellaneous remo-
vals and restoration.
7. Alley Block 103
North of Center Street.
Alley from 2nd North
Street to 3rd North
Street between Broad-
way and State Street.
Reconstruction of the
existing alley pave-
ment section including
grading, aggregate
base, bituminous sur-
facing, selective seven
inch (7″) concrete alley
approach pavement,
miscellaneous remo-
vals and restoration.
8. Miscellaneous Con-
crete Sidewalk and
ADA Improvements.
ADA pedestrian ramp
and recreational trail
improvements to com-
pliment the improve-
ments scheduled
within the 2024 Capital
Improvement Plan and
other deficient concrete
sidewalk at locations
determined by the City
Engineer.
pursuant to Minnesota
Statutes, Sections
429.011 to 429.111.
The area proposed to
be assessed for such
improvements is each
lot, piece and parcel of
property specially
benefited by said im-
provements. A reason-
able estimate of the
impact of the assess-
ment will be available
at the hearing. The to-
tal estimated cost of
the 2024 Utility, Street
and Alley Improve-
ments – Group I project
is $3,035,260.00. Such
persons as desired to
be heard with refer-
ence to the proposed
improvements will be
heard at this meeting.
By Order Of The City
Council
Nicole L. Jorgensen
Finance Director
Dated at New Ulm,
Minnesota
This 2 nd day of Janu-
ary 2024.
www.ci.new-ulm.mn.us