NOTICE OF PUBLIC

HEARING

NOTICE IS HEREBY

GIVEN, that the City

Council of the City of

New Ulm, Brown

County, Minnesota will

meet in the Council

Chambers in the New

Ulm City Hall on Tues-

day, August 2, 2022 at

4:30 p.m. to consider

ordering in the follow-

ing improvements:

2022 UTILITY,

STREET AND ALLEY

IMPROVEMENTS –

GROUP I

1. Jacobs Street and

Somsen Street Utility

and Roadway Exten-

sion. This project con-

sists of the extension

of watermain, sanitary

sewer main, storm

sewer main, construc-

tion of water and sewer

end services, grading,

aggregate base, bi-

tuminous base, con-

crete curb and gutter,

concrete sidewalk,

concrete driveway

pavement, bituminous

surfacing, boulevard

restoration and street

lighting in the Airport

Industrial Park Third

Addition.

2. German Street from

7th North Street to 12th

North Street. This pro-

ject consists of the

reconstruction of the

existing watermain,

sanitary sewer main,

sewer and water end

services, storm sewer

extension and modifi-

cation, and reconstruc-

tion of the existing

roadway section in-

cluding excavation and

replacement of

subgrade, aggregate

base, bituminous pav-

ing, pavement sub-

drains, concrete curb

and gutter, pedestrian

sidewalk ramps, street

lighting and selective

replacement of con-

crete driveway pave-

ment and sidewalk.

3. Alley Block 174

South of Center Street.

Alley from 7th South

Street to 8th South

Street between Payne

Street and Jefferson

Street. This project

consists of the recon-

struction of the existing

alley pavement section

including grading, ag-

gregate base, bitumi-

nous surfacing, seven

inch (7″) concrete alley

approach pavement,

underdrain, miscel-

laneous removals and

restoration.

4. Alley Block 196

North of Center Street.

Alley from 14th North

Street to 15th North

Street between Garden

Street and Payne

Street. This project

consists of the recon-

struction of the existing

alley pavement section

including grading, ag-

gregate base, bitumi-

nous surfacing, seven

inch (7″) concrete alley

approach pavement,

underdrain, miscel-

laneous removals and

restoration.

5. Alley Block 190

North of Center Street.

Alley from 8th North

Street to 9th North

Street between Garden

Street and Payne

Street. This project

consists of the recon-

struction of the existing

alley pavement section

including grading, ag-

gregate base, bitumi-

nous surfacing, seven

inch (7″) concrete alley

approach pavement,

underdrain, miscel-

laneous removals and

restoration.

6. Sanitary Sewer

Repairs. This project

consists of repairing

damaged sanitary

sewer piping on 19th

North Street in the in-

tersection of State

Street and lining the

sanitary sewer

manhole at 1st South

and Broadway.

7. Concrete Sidewalk

and ADA Improve-

ments. This project

consists of ADA

pedestrian ramp im-

provements to compli-

ment the improve-

ments scheduled

within the 2022 Sur-

face Reconstruction

Project to meet the

current ADA require-

ments as per New

Ulm’s adopted ADA

Transition Plan and

other deficient concrete

sidewalk at locations

determined by the City

Engineer.

pursuant to Minnesota

Statutes, Sections

429.011 to 429.111.

The area proposed to

be assessed for such

improvements is each

lot, piece and parcel of

property specially

benefited by said im-

provements. A reason-

able estimate of the

impact of the assess-

ment will be available

at the hearing. The to-

tal estimated cost of

the 2022 UTILITY,

STREET AND ALLEY

IMPROVEMENTS –

GROUP I project is

$4,237,630.00. Such

persons as desired to

be heard with refer-

ence to the proposed

improvements will be

heard at this meeting.

BY ORDER OF THE

CITY COUNCIL

Nicole L. Jorgensen

Finance Director

Dated at New Ulm,

Minnesota

This 19th day of July