Filing Notice For Cam-
bria Township
The citizens of Cam-
bria Township are
hereby notified that fil-
ing for candidates is
from August 2, 2022
through August 16,
2022, at 5:00p.m. The
filings are for 1 supervi-
sor position and one
clerk position for a 4
year term. Any person
wishing to file may do
so with the clerk. There
is a $2.00 filing fee.
elections will be held
with the General elec-
tions held on No-
vember 8, 2022
Brenda Hulke, Clerk
PUBLISH
(July 20, 2022)
NOTICE OF FILING
FOR TOWNSHIP
ELECTION
Notice is hereby given
to qualified voters of
Cottonwood Township,
Brown County, State of
Minnesota, that gen-
eral election for town
offices will be held No-
vember 8, 2022,
between the hours of 7
am and 8 pm. Affidav-
its of Candidacy shall
be filed with the Town
Clerk, at the Clerk’s of-
fice, 11562 Co Rd 24,
New Ulm. Filing will
close August 16, 2022
5:00 PM. Filing fee:
$2.00. Offices to be
filled are: one Supervi-
sor (3 year term) and
Town Clerk (2 year
term).
Lisa Leskey
Cottonwood Township
Clerk
PUBLISH
(July 20, 27, 2022)
NOTICE OF PUBLIC
HEARING
NOTICE IS HEREBY
GIVEN, that the City
Council of the City of
New Ulm, Brown
County, Minnesota will
meet in the Council
Chambers in the New
Ulm City Hall on Tues-
day, August 2, 2022 at
4:30 p.m. to consider
ordering in the follow-
ing improvements:
2022 UTILITY,
STREET AND ALLEY
IMPROVEMENTS –
GROUP I
1. Jacobs Street and
Somsen Street Utility
and Roadway Exten-
sion. This project con-
sists of the extension
of watermain, sanitary
sewer main, storm
sewer main, construc-
tion of water and sewer
end services, grading,
aggregate base, bi-
tuminous base, con-
crete curb and gutter,
concrete sidewalk,
concrete driveway
pavement, bituminous
surfacing, boulevard
restoration and street
lighting in the Airport
Industrial Park Third
Addition.
2. German Street from
7th North Street to 12th
North Street. This pro-
ject consists of the
reconstruction of the
existing watermain,
sanitary sewer main,
sewer and water end
services, storm sewer
extension and modifi-
cation, and reconstruc-
tion of the existing
roadway section in-
cluding excavation and
replacement of
subgrade, aggregate
base, bituminous pav-
ing, pavement sub-
drains, concrete curb
and gutter, pedestrian
sidewalk ramps, street
lighting and selective
replacement of con-
crete driveway pave-
ment and sidewalk.
3. Alley Block 174
South of Center Street.
Alley from 7th South
Street to 8th South
Street between Payne
Street and Jefferson
Street. This project
consists of the recon-
struction of the existing
alley pavement section
including grading, ag-
gregate base, bitumi-
nous surfacing, seven
inch (7″) concrete alley
approach pavement,
underdrain, miscel-
laneous removals and
restoration.
4. Alley Block 196
North of Center Street.
Alley from 14th North
Street to 15th North
Street between Garden
Street and Payne
Street. This project
consists of the recon-
struction of the existing
alley pavement section
including grading, ag-
gregate base, bitumi-
nous surfacing, seven
inch (7″) concrete alley
approach pavement,
underdrain, miscel-
laneous removals and
restoration.
5. Alley Block 190
North of Center Street.
Alley from 8th North
Street to 9th North
Street between Garden
Street and Payne
Street. This project
consists of the recon-
struction of the existing
alley pavement section
including grading, ag-
gregate base, bitumi-
nous surfacing, seven
inch (7″) concrete alley
approach pavement,
underdrain, miscel-
laneous removals and
restoration.
6. Sanitary Sewer
Repairs. This project
consists of repairing
damaged sanitary
sewer piping on 19th
North Street in the in-
tersection of State
Street and lining the
sanitary sewer
manhole at 1st South
and Broadway.
7. Concrete Sidewalk
and ADA Improve-
ments. This project
consists of ADA
pedestrian ramp im-
provements to compli-
ment the improve-
ments scheduled
within the 2022 Sur-
face Reconstruction
Project to meet the
current ADA require-
ments as per New
Ulm’s adopted ADA
Transition Plan and
other deficient concrete
sidewalk at locations
determined by the City
Engineer.
pursuant to Minnesota
Statutes, Sections
429.011 to 429.111.
The area proposed to
be assessed for such
improvements is each
lot, piece and parcel of
property specially
benefited by said im-
provements. A reason-
able estimate of the
impact of the assess-
ment will be available
at the hearing. The to-
tal estimated cost of
the 2022 UTILITY,
STREET AND ALLEY
IMPROVEMENTS –
GROUP I project is
$4,237,630.00. Such
persons as desired to
be heard with refer-
ence to the proposed
improvements will be
heard at this meeting.
BY ORDER OF THE
CITY COUNCIL
Nicole L. Jorgensen
Finance Director
Dated at New Ulm,
Minnesota
This 19th day of July
2022.