Public notices
PUBLISH
(July 24, 31, 2018)
NOTICE OF PUBLIC
HEARING
NOTICE IS HEREBY
GIVEN, that the City
Council of the City of
New Ulm, Brown
County, Minnesota will
meet in the Council
Chambers in the New
Ulm City Hall on Tues-
day, August 7, 2018 at
4:30 p.m. to consider
ordering in the follow-
ing improvements, ex-
cept items 6, 7, 8, and
9 which have previous-
ly been approved to be
made, to-wit:
2018 Utility, Street
and Alley Improve-
ments – Group I
1. Cottonwood Street
from Butternut Street to
250 feet south of
Ridgeview Drive –
Grading, aggregate
base, bituminous base,
storm sewer, pave-
ment edge drains, con-
crete curb and gutter,
concrete sidewalk,
concrete driveway
pavement, bituminous
surfacing, recreational
trail, boulevard trees,
boulevard restoration,
street lighting and pro-
perty acquisition.
2. Ridgeview Drive
from Cottonwood
Street to west terminus
– Grading, aggregate
base, bituminous base,
pavement edge drains,
concrete curb and
gutter, concrete side-
walk, concrete drive-
way pavement, bi-
tuminous surfacing,
boulevard trees,
boulevard restoration,
street lighting and pro-
perty acquisition.
3. Jefferson Street
from 5th to 7th North
Street – Reconstruc-
tion of the existing wa-
ter main, sanitary
sewer main, sewer and
water end services,
and reconstruction of
the existing roadway
section including ex-
cavation and replace-
ment of subgrade, ag-
gregate base, bitumi-
nous paving, storm
sewer extension, con-
crete curb and gutter,
concrete driveway
pavement, pedestrian
sidewalk ramps, street
lighting and selective
replacement of con-
crete sidewalk.
4. Alison Avenue,
Ryan Road, Airport
Road, Maplewood
Drive and the alley in
and adjacent to Sarah
Hills Third Addition –
Grading, aggregate
base, bituminous base,
concrete curb and
gutter, concrete side-
walk, concrete drive-
way pavement, bitumi-
nous surfacing,
boulevard trees,
boulevard restoration
and street lighting.
5. Oakwood Avenue
from North Highland
Avenue to Hazelwood
Avenue – Reconstruc-
tion of the existing
roadway section in-
cluding excavation and
replacement of
subgrade, pavement
edge drains, aggregate
base, bituminous pav-
ing and selective re-
placement of concrete
curb and gutter and
concrete driveway
pavement.
6. Alley Block 185
North of Center Street
– Grading, aggregate
base, bituminous sur-
facing, seven inch (7″)
concrete alley ap-
proach pavement,
storm sewer, miscel-
laneous removals and
restoration necessary
to construct a residen-
tial alley pavement
section (improvement
petitioned).
7. Alley Block 152
North of Center Street
– Grading, aggregate
base, bituminous sur-
facing, seven inch (7″)
concrete alley ap-
proach pavement,
storm sewer, miscel-
laneous removals and
restoration necessary
to construct a residen-
tial alley pavement
section (improvement
petitioned).
8. Alley Block 10 South
of Center Street –
Grading, aggregate
base, bituminous sur-
facing, seven inch (7″)
concrete alley ap-
proach pavement, mis-
cellaneous removals
and restoration neces-
sary to construct a
residential alley pave-
ment section (improve-
ment petitioned).
9. Alley Block 143
South of Center Street
– Grading, aggregate
base, bituminous sur-
facing, seven inch (7″)
concrete alley ap-
proach pavement,
storm sewer, miscel-
laneous removals and
restoration necessary
to construct a residen-
tial alley pavement
section (improvement
petitioned).
10. 20th North Street
from Spring Street to
alley in Block 202
North and Front Street
from 20th North Street
to 19th North Street –
Water main, sanitary
sewer main, sanitary
sewer lift station and
force main, sanitary
sewer and water end
services, storm sewer
modification, roadway
and boulevard res-
toration.
11. Birchwood Drive,
Turner Road and Ma-
plewood Drive in
Fairhills Fifth Addition –
Construct bituminous
wear course and
pedestrian sidewalk in-
fill.
12. Miscellaneous
Concrete Sidewalk
Repairs – Settlement
on Summit Avenue
pursuant to Minnesota
Statutes, Sections
429.011 to 429.111.
The area proposed to
be assessed for such
improvements is each
lot, piece and parcel of
property specially
benefited by said im-
provements. A reason-
able estimate of the
impact of the assess-
ment will be available
at the hearing. The to-
tal estimated cost of
the 2018 Utility, Street
and Alley Improve-
ments – Group I pro-
ject is $3,470,093.50.
Such persons as
desired to be heard
with reference to the
proposed improve-
ments will be heard at
this meeting.
BY ORDER OF THE
CITY COUNCIL
Nicole L. Jorgensen
Finance Director
Dated at New Ulm,
Minnesota this 17th
day of July 2018.
www.ci.new-ulm.mn.us
PUBLISH
(July 24, 31, 2018)
NOTICE OF PUBLIC
HEARING
NOTIC IS HEREBY
GIVEN, that the City
Council of the City of
New Ulm, Brown
County, Minnesota will
meet in the Council
Chambers in the New
Ulm City Hall on Tues-
day, August 7, 2018 at
4:30 p.m. to consider
ordering in the follow-
ing improvements to
be made, to-wit:
2018 MSAS Improve-
ment Project
1. German Street from
3rd North Street to 7th
North Street– Recon-
struction of the existing
water mains, sanitary
sewer main, sewer and
water end services,
and reconstruction of
the existing roadway
section including exca-
vation and replacement
of subgrade, aggregate
base, bituminous pav-
ing, concrete curb and
gutter, concrete drive-
way pavement, pedes-
trian sidewalk ramps,
pedestrian crosswalk
extensions at 4th and
5th North Street, street
lighting and selective
replacement of con-
crete sidewalk.
pursuant to Minnesota
Statutes, Sections
429.011 to 429.111.
The area proposed to
be assessed for such
improvements is each
lot, piece and parcel of
property specially
benefited by said im-
provements. A rea-
sonable estimate of the
impact of the assess-
ment will be available
at the hearing. The to-
tal estimated cost of
the 2018 MSAS Im-
provements Project is
$1,342,924.00. Such
persons as desired to
be heard with refer-
ence to the proposed
improvements will be
heard at this meeting.
BY ORDER OF THE
CITY COUNCIL
Nicole L. Jorgensen
Finance Director
Dated at New Ulm,
Minnesota this 17th
day of July 2018
www.ci.new-ulm.mn.us