PUBLISH
(March 5, 12, 2013)
NOTICE OF PUBLIC
HEARING
NOTICE IS HEREBY
GIVEN, that the City
Council of the City of
New Ulm, Brown
County, Minnesota will
meet in the Council
Chambers in the New
Ulm City Hall on Tues-
day, March 19,2013 at
5:00 p.m. to consider
ordering in the follow-
ing improvements, ex-
cept item 10 which
has previously been
approved to be made,
to-wit:
2013 UTILITY,
STREET AND ALLEY
IMPROVEMENTS
GROUP I
1. Franklin Street from
Center Street to 6th
South Street Recon-
struction of the exist-
ing water main, sani-
tary sewer main,
sewer and water end
services, storm sewer
extension and recon-
struction of the exist-
ing roadway section in-
cluding excavation and
replacement of
subgrade, aggregate
base, bituminous pav-
ing, concrete curb and
gutter, concrete drive-
way pavement, pedes-
trian sidewalk ramps,
street lighting and
selective replacement
of concrete sidewalk.
2. 5th South Street
from Jefferson Street
to Franklin Street
Reconstruction of the
existing roadway sec-
tion including excava-
tion and replacement
of subgrade, aggregate
base, bituminous pav-
ing, storm sewer
reconstruction and
selective replacement
of concrete curb and
gutter and concrete
driveway pavement.
3. 6th South Street
from Jefferson Street
to Franklin Street
Reconstruction of the
existing sanitary sewer
main, sewer end ser-
vices and reconstruc-
tion of the existing
roadway section in-
cluding excavation and
replacement of
subgrade, aggregate
base, bituminous pav-
ing and selective re-
placement of concrete
curb and gutter and
concrete driveway
pavement.
4. Minnesota Street
from 4th North Street
to 7th North Street
Reconstruction of the
existing water main,
sanitary sewer main,
sewer and water end
services, reconstruc-
tion of the existing
roadway section in-
cluding excavation and
replacement of
subgrade, aggregate
base, bituminous pav-
ing, concrete curb and
gutter, concrete drive-
way pavement, pedes-
trian sidewalk ramps,
boulevard trees, street
lighting and selective
replacement of con-
crete sidewalk.
5. 6th North Street
from German to Min-
nesota Street
Reconstruction of the
existing sanitary sewer
main.
6. 11th North Street
and Bishop Lucker
Lane in Oak Bluffs
Sixth Addition Grad-
ing, aggregate base,
bituminous base, con-
crete curb and gutter,
concrete sidewalk,
concrete driveway
pavement, bituminous
surfacing, boulevard
trees, boulevard res-
toration and street
lighting.
7. Indian Point Drive in
Fesenmeier's and
Conklin Addition
Reconstruction of the
existing roadway sec-
tion including excava-
tion and replacement
of subgrade, pavement
edge drains, aggregate
base, bituminous pav-
ing and selective re-
placement of concrete
curb and gutter and
concrete driveway
pavement.
8. Public Utilities
Second Addition Re-
location of the existing
sanitary sewer main
away from the PUC
Electrical Distribution
building, extend the
existing sewer service,
repair the bituminous
surface and fill the
abandoned sanitary
sewer main.
9. Alley Block 78 North
of Center Street
Reconstruction of the
existing commercial al-
ley pavement section
including grading, ag-
gregate base, bitumi-
nous surfacing, seven
inch (7") concrete alley
approach pavement,
miscellaneous remo-
vals and restoration.
10. Alley Block 88
North of Center Street
Grading, aggregate
base, bituminous sur-
facing, seven inch (7")
concrete alley ap-
proach pavement, mis-
cellaneous removals
and restoration neces-
sary to construct a
commercial alley pave-
ment section (improve-
ment petitioned).
pursuant to Minnesota
Statutes, Sections
429.011 to 429.111.
The area proposed to
be assessed for such
improvements is each
lot, piece and parcel of
property specially
benefited by said im-
provements. A reason-
able estimate of the
impact of the assess-
ment will be available
at the hearing. The to-
tal estimated cost of
the 2013 UTILITY,
STREET AND ALLEY
IMPROVEMENTS
GROUP I project is
$2,837,709.00. Such
persons as desired to
be heard with refer-
ence to the proposed
improvements will be
heard at this meeting.
BY ORDER OF THE
CITY COUNCIL
Reginald K. Vorwerk
Finance Director
Dated at New Ulm,
Minnesota This 19th
day of February 2013.

